-
GB/T 30372-2024 in English
Guide for acceptance of distributed control system for thermal power plant
valid
Issued on:2024-08-23
RFQ -
GB/T 2317.4-2023 in English
Test method for electric power fittings―Part 4:Acceptance inspection
valid
Issued on:2023-03-17
$308.00 -
GB/T 2315-2017 in English
Specified failure load series and coupling dimensionsfor electric power fittings
valid
Issued on:2017-12-29
$264.00 -
NB/T 42074-2016 in English
Specification of safety for unattended small hydropower station
valid
Issued on:2016-08-16
$295.00 -
NB/T 42033-2014 in English
Specification of centralized control system for small hydropower stations group
valid
Issued on:2014-06-29
$252.00 -
DL/T 1101-2009 in English
Acceptance specification for 35kV~110kV substation automation system
valid
Issued on:2009-07-22
$640.00 -
DL/T 1120-2009 in English
Specification of autotest and real-time simulation to for hydraulic turbine governor
superseded
Issued on:2009-07-01
$640.00 -
DL/T 1098-2009 in English
Requirements and tests for overhead line spacers
superseded
Issued on:2009-07-01
$240.00 -
DL/T 1099-2009 in English
Technical requirements and tests for damper
superseded
Issued on:2009-07-01
$216.00 -
GB/T 2317.1-2008 in English
Test method for electric power fittings - Part 1: Mechanical tests
valid
Issued on:2008-12-30
$168.00